Questions worth asking before you book a stand
Straight answers on planning, formats, installation, reuse and coverage. If a question here is not the one you have, send it to us directly.
As soon as the space is confirmed. The design is rarely the constraint. Production lead times, organiser deadlines for technical drawings and venue access dates are, and they are all fixed before you meet them. Starting early does not make the stand better on its own, but it removes the decisions that get made badly under pressure.
Yes. Standform is based in London and works across the UK, including the Midlands, the North and Scotland. The venue sets the build window and the transport plan, so a project outside London is planned the same way, with the longer leg accounted for from the start.
Yes. European exhibitions are part of the normal coverage, including venues in the Netherlands, Germany, Spain and France. Transport, crew and technical submissions are planned for the specific show and venue.
It can, if it is designed for it. A stand built on a frame system, with graphics that can be reprinted and a footprint that can be reconfigured, will survive several shows. A one-off bespoke build often cannot be reused without significant rework, which is a decision to make at the design stage rather than after the first exhibition.
A bespoke stand is designed for one brand and one space. A modular stand is built to be reconfigured across different floor plans and shows. A hybrid keeps a reusable structural core and adds custom elements for each exhibition. The question that decides it is how many times the stand will be built.
Yes. An existing concept, a floor plan from the organiser or a stand designed elsewhere can all be taken as the starting point. We would check it against the venue rules, the access window and the production reality before committing it to a build.
Yes. Installation, on-site assembly, coordination with the venue and the organiser, handover before opening and the dismantle afterwards are all part of the delivery, not separate purchases from separate suppliers.
Yes. Storage comes with an inventory of the components, condition checks after each show and repairs before the stand goes back into store. Storage without an inventory is just a warehouse, and the value of the stand quietly disappears.
The exhibition, the venue and hall, the floor space and the number of open sides, the opening date and what the stand needs to achieve. The floor plan and your brand guidelines are useful. If some of that is still unknown, the conversation is still worth having.
Yes. A shell scheme upgrade turns the walls supplied by the organiser into a branded environment, with full-height graphics, lighting, flooring and counters. It is often the right answer for a smaller space or a first exhibition.
Still have a question?
Send the show, the venue and what you are trying to work out. A short answer is usually enough to move the decision forward.